Blue Mountains Council Stormwater & Drainage Requirements
Blue Mountains DCP 2015 stormwater and WSUD requirements for builders - ridge-top development, World Heritage catchments and sensitive discharge design.
Read article
Hornsby Shire markets itself as the Bushland Shire for good reason – much of the LGA is national park, reserve and bushland gully. Development pressure is concentrated along the rail and road corridors, with steady activity in Hornsby, Asquith, Waitara, Thornleigh, Cherrybrook and the rural-residential areas around Galston and Dural. Hornsby Town Centre and the Asquith to Mount Colah corridor have seen apartment growth, while dual occupancies and granny flats are common across the established suburbs.
Because so many sites back onto bushland or drain to sensitive creeks, Hornsby Shire Council takes a careful approach to stormwater. Builders who understand the requirements before lodging save weeks of assessment time.
The key document is the Hornsby Development Control Plan 2013, which contains Council’s water management controls alongside the Hornsby Local Environmental Plan 2013. Council supports the DCP with engineering documents – including its Civil Works Specification and Water Sensitive Urban Design (WSUD) Reference Guidelines – that set out how drainage and treatment systems must actually be designed and built.
The intent running through these documents is consistent: development should not increase peak flows or pollutant loads reaching the Shire’s creeks and bushland, and stormwater systems must be durable and maintainable.
Exact discharge limits, storm events and storage requirements should be confirmed against the current DCP and Council specifications at design time.
Hornsby’s terrain is classic Hawkesbury sandstone country – ridgetop development falling steeply into bushland gullies that feed Berowra Creek, Cowan Creek and ultimately the Hawkesbury River. This creates several recurring design issues:
Contrive Consultants prepares stormwater drainage and OSD designs for dwellings, duplexes and townhouse projects across Hornsby Shire, from Asquith infill blocks to rural lots at Galston. See our civil and stormwater services or contact us today – call +61 497 848 111 or email info@contriveconsultants.com.au.
Blue Mountains DCP 2015 stormwater and WSUD requirements for builders - ridge-top development, World Heritage catchments and sensitive discharge design.
Read articleSutherland Shire Council stormwater and OSD requirements under DCP 2015 Chapter 38 - what builders of duplexes and townhouses need…
Read articleWollongong DCP 2009 Chapter E14 stormwater and OSD requirements explained for builders - escarpment runoff, intense rainfall and flood controls.
Read article