Telecoms Design for Multi-Dwelling Projects: Duplex to Townhouse
How telecommunications infrastructure design works for duplexes, dual occupancies and townhouse projects in NSW - lead-ins, conduits and the NBN…
Read article
Of all the documents in a NSW development application, the waste management plan (WMP) is the one most often treated as a box-ticking exercise – and one of the most common sources of council requests for information when it is done badly. Councils have become genuinely rigorous about waste: they know that a townhouse project with nowhere sensible to put twelve bins, or an apartment building whose waste room cannot be reached by a collection vehicle, becomes their operational problem for the next fifty years.
A good WMP answers three questions convincingly: what waste the project generates during demolition and construction and where it goes; how much operational waste the completed development produces; and how bins are stored, presented and collected without blocking driveways, damaging vehicles or annoying the neighbours. This article explains what NSW councils actually assess, and how the waste and civil team at Contrive Consultants – the Rouse Hill engineering practice at the core of the Contrive group – puts together WMPs and waste collection designs that get through assessment the first time.
Most NSW councils require a WMP (sometimes called a waste and recycling management plan) with development applications for new dwellings, dual occupancies, multi-dwelling housing, apartment buildings, commercial and industrial projects, and often for substantial alterations and demolition. The requirement, the template and the standards live in each council’s development control plan (DCP) or a dedicated waste DCP chapter – and they differ meaningfully between councils, which is the first trap. A WMP written to one council’s template and recycled for a site two suburbs away, under a different council, is an easy request-for-information waiting to happen.
Structurally, nearly every council wants the plan split into three phases:
For the demolition and construction phases, councils are checking that you have thought about resource recovery rather than defaulting everything to landfill, and that waste will be managed lawfully. The plan should identify the main material streams and realistic quantities, nominate separation and recycling (concrete and brick crushing, metal recycling, timber and cardboard recovery), name the class of facility receiving each stream, and address site management basics – container locations, protecting the public way, and preventing tracking and littering. Councils also increasingly cross-reference this section against the sediment and erosion controls on your civil plans, which is one of several reasons it helps when the same consultancy prepares both.
Keep it honest and specific. Assessors read enough boilerplate to recognise it instantly; a page of genuine, project-specific content outperforms ten pages of copied generalities.
The operational section is where design meets assessment, and it is where most refusals and RFIs originate. Councils typically assess five things.
Bin provision is calculated from council-specified generation rates – typically expressed per dwelling for residential uses (with separate rates for garbage, recycling and, increasingly, food and garden organics), and per unit of floor area for commercial uses. The WMP must show the arithmetic: number of dwellings, generation rates, collection frequency, and the resulting count of 240-litre bins or shared bulk bins (such as 660 L or 1100 L containers) needed for each stream. Under-providing is a refusal reason; grossly over-providing wastes floor area you could have sold.
Wherever the bins live – individual storage on each lot, a communal bin bay, or an internal waste room – councils assess capacity (do all the bins physically fit, with circulation space?), accessibility for residents, ventilation and washdown provisions for enclosed rooms, screening and amenity for outdoor bays, and travel distance from dwellings. For apartment buildings, waste room location and chute design (where used) come under the relevant design guidance, and the interaction with fire compartments and hydraulic services needs coordination with the rest of the documentation.
How do bins get from storage to the truck? For small projects, kerbside presentation may be fine – provided the frontage actually has enough kerb length for the bins without blocking driveways, and the plan demonstrates it. Larger projects usually need an on-site collection point, and this is where waste design becomes traffic design: who moves the bins (residents, a caretaker, a contractor), the path and gradients they travel, and where the vehicle stands while loading.
If a waste vehicle enters the site, councils will want swept path analysis demonstrating that the design collection vehicle can enter, reach the collection point, and leave – in most councils, in a forward direction – without conflict. Waste trucks are big, heavy and unforgiving: pavement strength, height clearance to awnings and basement entries, grades the vehicle can negotiate, and turning geometry all need checking against the council’s nominated design vehicle. Within the Contrive group this is where Sweptpaths, our traffic engineering consultancy, runs the vehicle turning simulations that accompany the WMP – so the waste plan and the traffic plan tell the same story instead of contradicting each other.
The WMP must nominate who collects: council’s domestic service (with its eligibility rules – many councils will not service basements or private internal roads) or a private contractor. Choosing wrongly is a classic error. If the design assumes council collection but the site cannot meet council’s servicing requirements, the whole operational chapter unravels. Confirm the service model with council early, then design to it.
Waste design touches almost every other discipline on the site. The collection vehicle’s swept path constrains driveway geometry and basement ramp grades; the bin bay competes with deep soil zones and landscaping (where ARQI‘s landscape architects get involved); waste room drainage connects to the hydraulic and stormwater design; and on subdivisions, the collection strategy interacts with road widths and cul-de-sac heads that the civil design sets. Handled by a coordinated team, these constraints get resolved once, on the drawings. Handled by disconnected consultants, they get resolved by RFI – slowly, and at your cost.
That is the practical argument for having the WMP prepared inside the same group that does the civil, traffic and landscape work: Contrive Consultants (contriveconsultants.com.au) prepares the plan with the swept paths, stormwater and landscape already reconciled, and with the planning context checked by the group’s planners at URBA.
Many NSW councils require at least a basic WMP for new dwellings and dual occupancies, covering demolition/construction waste and showing where bins are stored and presented. For duplexes, kerb frontage for bin presentation is the item to check – corner lots and narrow frontages can genuinely struggle. Check your council’s DCP; the requirement and template vary.
Sometimes – it depends on the council’s collection policy and whether the site meets its servicing requirements (access geometry, pavement, forward egress and similar). Many councils will not send their vehicles into basements or private internal driveways, in which case you design for private contractor collection or for bin presentation at an approved collection point. Confirm the model with council before locking the design.
Swept path analysis is a computer simulation of the space a specific design vehicle occupies while turning. When your development requires on-site waste collection, councils want proof the collection vehicle can service the site safely and leave in a forward gear – the swept path drawings are that proof, and they should be prepared alongside the WMP so the two documents match.
Enough to be credible: the main material streams, realistic estimated quantities, how each will be reused, recycled or disposed of, and the type of lawful facility receiving it, plus on-site storage and public-way protection. Project-specific and concise beats long and generic – assessors are checking that waste has been genuinely considered, not weighed by the kilogram of paperwork.
Contrive Consultants (contriveconsultants.com.au) prepares waste management plans and bin collection designs across NSW, coordinated with the Contrive group’s traffic, landscape, planning and stormwater teams in Rouse Hill. View our services or contact us to discuss your DA: +61 497 848 111, info@contriveconsultants.com.au.
How telecommunications infrastructure design works for duplexes, dual occupancies and townhouse projects in NSW - lead-ins, conduits and the NBN…
Read articleDetail, identification, level, set-out and WAE surveys explained - what each one is for, when your NSW project needs it,…
Read articleBASIX raised its thermal and energy standards from 1 October 2023. What the 7-star era means for NSW builders -…
Read article