Blue Mountains Council Stormwater & Drainage Requirements
Blue Mountains DCP 2015 stormwater and WSUD requirements for builders - ridge-top development, World Heritage catchments and sensitive discharge design.
Read article
Camden has been Australia’s fastest-growing local government area for much of the past decade. Oran Park, Gregory Hills, Leppington (south), Catherine Field, Spring Farm, Harrington Park, Narellan and Cobbitty are delivering new homes at extraordinary pace as the South West Growth Area builds out. For builders and developers, Camden Council’s assessment process is well-organised but firm – and stormwater documentation is checked closely on every residential application.
The principal document is the Camden Development Control Plan 2019 (Camden DCP 2019), which contains general land use controls for water management alongside residential development controls. The DCP requires development to demonstrate compliance with Council’s Engineering Specifications – Camden’s engineering design and construction specifications – which carry the detailed technical criteria for detention, drainage and water sensitive urban design.
Land within Growth Centre precincts may also be subject to precinct-specific planning with its own water cycle strategies, so confirm exactly which controls apply to your lot before design begins.
In estates like Oran Park and Gregory Hills, much of the stormwater infrastructure – trunk drainage, basins, raingardens – was delivered by the land developer. Your job as a builder is usually to connect correctly: match the lot’s designated discharge point, respect any overland flow or drainage reserve on the lot, and comply with estate-specific requirements. Problems arise when dwellings are designed without checking the subdivision’s drainage strategy.
Obtain the lot’s subdivision drainage information and a detail survey before design, confirm whether OSD applies or has been provided regionally, and have a civil engineer prepare a drainage plan to Camden’s current Engineering Specifications. For duplexes and townhouses in older areas like Narellan and Elderslie, resolve the OSD concept and any easement requirements before lodgement to keep assessment on track.
Contrive Consultants prepares stormwater and OSD designs accepted by Camden Council across the South West Growth Area. Explore our services or contact us – call +61 497 848 111 or email info@contriveconsultants.com.au for a council-ready design.
Blue Mountains DCP 2015 stormwater and WSUD requirements for builders - ridge-top development, World Heritage catchments and sensitive discharge design.
Read articleWhat Blacktown City Council requires for stormwater, OSD and WSUD under DCP 2015 - a practical guide for builders and…
Read articleCanterbury-Bankstown DCP 2023 stormwater and OSD requirements - what duplex and townhouse builders in Bankstown and Campsie need before lodging.
Read article