Wollongong Council Stormwater Requirements: Builder’s Guide
Wollongong DCP 2009 Chapter E14 stormwater and OSD requirements explained for builders - escarpment runoff, intense rainfall and flood controls.
Read article
The Blue Mountains is unlike any other NSW council area: a string of towns along a single ridgeline, surrounded on both sides by the Greater Blue Mountains World Heritage Area. Building activity is steady rather than booming – new dwellings, knock-down rebuilds and dual occupancies in Katoomba, Leura, Wentworth Falls and Blackheath in the upper mountains, and stronger volumes through Springwood, Winmalee, Blaxland and Glenbrook in the lower mountains, where Sydney commuters keep demand healthy.
Because every backyard here ultimately drains into protected bushland or drinking water catchment, Blue Mountains City Council treats stormwater as an environmental issue first and an engineering issue second. Builders should expect closer scrutiny of discharge arrangements than almost anywhere in the Sydney region.
The governing document is the Blue Mountains Development Control Plan 2015, which contains Council’s water management and water sensitive urban design (WSUD) controls alongside Blue Mountains Local Environmental Plan 2015. The DCP requires stormwater systems to be designed to current WSUD best practice, using a treatment train – a sequence of measures providing retention, filtering, infiltration and safe disposal – rather than a single pipe-to-street solution. Typical elements include rainwater tanks with re-use, detention basins or tanks, raingardens, and sediment and gross pollutant capture.
Parts of the LGA also drain toward Sydney’s drinking water catchment, where development must achieve a neutral or beneficial effect on water quality under the state framework – another layer on top of Council’s own controls.
Targets and sizing should be confirmed against the current DCP and Council’s engineering requirements, as guidance documents are updated periodically.
The defining condition is topography. Towns sit on the ridge; everything else falls away steeply into the Jamison, Grose and Megalong valleys. Stormwater leaving a building site can quickly become an erosion gully in hanging swamps and sandstone bushland below – and those downslope communities, including endangered upland swamps, are exactly what the World Heritage listing protects.
Practical consequences for builders include shallow sandstone making excavation costly, dispersive and erodible soils on slopes, limited formal street drainage in older areas, and bushfire controls interacting with landscape and drainage design. Council’s expectation is simple: water leaves the site at no greater rate, and in no worse condition, than it did before development.
Contrive Consultants prepares WSUD-based stormwater and OSD designs for homes and dual occupancies across the Blue Mountains, from Glenbrook to Blackheath. View our stormwater design services or contact the team – call +61 497 848 111 or email info@contriveconsultants.com.au.
Wollongong DCP 2009 Chapter E14 stormwater and OSD requirements explained for builders - escarpment runoff, intense rainfall and flood controls.
Read articleSutherland Shire Council stormwater and OSD requirements under DCP 2015 Chapter 38 - what builders of duplexes and townhouses need…
Read articleStormwater and flood-prone land requirements in the Hawkesbury LGA - what builders in Windsor, Pitt Town and Vineyard need before…
Read article