Sutherland Shire Stormwater & OSD Requirements Explained
Sutherland Shire Council stormwater and OSD requirements under DCP 2015 Chapter 38 - what builders of duplexes and townhouses need…
Read article
Blacktown City is one of the fastest-growing local government areas in Australia. Suburbs such as Marsden Park, Schofields, Riverstone, The Ponds, Quakers Hill and Kellyville Ridge are seeing thousands of new dwellings, duplexes and townhouse projects every year, much of it within the North West Growth Area. With that growth comes one of the most rigorous stormwater assessment regimes of any Sydney council – and it is the area where development applications most commonly stall.
This guide explains what Blacktown City Council expects from your stormwater and on-site detention (OSD) design, and how to get it right the first time.
The key document is the Blacktown Development Control Plan 2015 (DCP 2015). For water matters, the critical chapter is Part J – Water Sensitive Urban Design and Integrated Water Cycle Management, which sets out Council’s expectations for stormwater quantity, quality and waterway protection across the LGA. Council also publishes an engineering design library and a developer “toolkit” for water sensitive urban design (WSUD) that sits alongside the DCP and guides the detailed design stage.
Development in release precincts such as Marsden Park, Schofields and Riverstone may also be subject to precinct-specific plans under the North West Growth Area framework, which carry their own drainage strategies and detention rules.
For dwellings, duplexes, townhouses and small subdivisions, expect Council to look for the following before approval:
Dual occupancy and multi-dwelling projects are where most stormwater refusals happen. The added roof and driveway area almost always triggers OSD, and tight infill lots in suburbs like Quakers Hill and Lalor Park often have limited fall to the street. Underground detention tanks are common where landscape area is constrained, but Council will scrutinise access, maintenance and overflow provisions.
Before lodging your DA, commission a site survey with accurate levels, confirm the lawful point of discharge, and have a civil engineer prepare a concept stormwater and OSD layout that matches Council’s current Part J criteria. If an easement is needed, open negotiations with the downstream owner immediately. Getting the stormwater strategy resolved at concept stage is far cheaper than responding to a Council request for information after lodgement.
Contrive Consultants prepares stormwater drainage plans, OSD designs and WSUD documentation accepted by Blacktown City Council. Based in Rouse Hill, we work across the North West Growth Area every week. Explore our stormwater and civil engineering services or get in touch – call +61 497 848 111 or email info@contriveconsultants.com.au for a fast, council-ready design.
Sutherland Shire Council stormwater and OSD requirements under DCP 2015 Chapter 38 - what builders of duplexes and townhouses need…
Read articleCanterbury-Bankstown DCP 2023 stormwater and OSD requirements - what duplex and townhouse builders in Bankstown and Campsie need before lodging.
Read articleCity of Parramatta stormwater rules under DCP 2023 - OSD to the UPRCT handbook, drainage plans and WSUD for infill…
Read article