Penrith Council Stormwater, OSD & WSUD Requirements Guide
Penrith DCP 2014 stormwater rules explained - OSD, WSUD and drainage plan requirements for builders in Jordan Springs, Glenmore Park…
Read article
Wollondilly Shire is where Sydney’s south-west growth meets the countryside. The Wilton growth area is delivering thousands of new lots in one of NSW’s largest land releases, while Tahmoor, Thirlmere and Bargo absorb steady housing demand along the rail line, Picton remains the shire’s historic centre, and rural-residential building continues around The Oaks and Appin Road corridors. For builders, the shire offers volume – but also a drainage environment quite different from metropolitan Sydney.
The governing document is the Wollondilly Development Control Plan 2016, structured as a series of volumes covering general requirements, subdivision, residential development and infrastructure. Stormwater controls appear through the residential and subdivision volumes, with detailed engineering governed by the Wollondilly Design Specification, Council’s adopted standard for drainage and civil works.
Within the Wilton growth area, state-led precinct plans and development control documents add a further layer, with stormwater and water quality strategies set at precinct scale – builders working there should confirm which controls apply to their stage.
Discharge limits and storage requirements vary by location and by what was locked in at subdivision, so confirm current figures with Council or your engineer rather than assuming.
Much of Wollondilly drains to the Nepean River and its tributaries within the broader Hawkesbury-Nepean system, and parts of the shire fall within Sydney’s drinking water catchment, where development must achieve a neutral or beneficial effect on water quality. Receiving waterways here are creeks and rivers rather than piped systems, which changes how Council looks at discharge.
Key practical issues include:
Contrive Consultants prepares stormwater and OSD designs for new homes, rural-residential lots and project builds across Wollondilly Shire, from Picton to the Wilton growth area. Explore our stormwater services or contact us – call +61 497 848 111 or email info@contriveconsultants.com.au.
Penrith DCP 2014 stormwater rules explained - OSD, WSUD and drainage plan requirements for builders in Jordan Springs, Glenmore Park…
Read articleWhat builders need to know about Northern Beaches Council stormwater and OSD requirements under the Water Management for Development Policy.
Read articleSutherland Shire Council stormwater and OSD requirements under DCP 2015 Chapter 38 - what builders of duplexes and townhouses need…
Read article